Ownership & Size: | Big Ridge (formerly Alto)-100% |
|||||||||||||||||||||||||||||||||||||||||||||
Stage: | Early-stage: The property hosts a multitude of gold occurrences associated with hydrothermally altered and sheared breccia zones within intermediate intrusive rocks. As currently known, the intrusive body hosting the various breccia zones has surface dimensions of 2.5 km by 1.5 km. Alto completed extensive surface stripping and sampling programs in the period from 2009 to 2011 and diamond drilling in 2011 and 2018. In aggregate 2,737 m of drilling was completed in 14 drill holes. Significant gold results were obtained from these surface and drilling programs. |
|||||||||||||||||||||||||||||||||||||||||||||
Location & Infrastructure | Pifher Township, 45 km northeast of the Town of Beardmore. Year-round access via Trans-Canada Highway 17 and direct property access from the all-weather 801 Road which passes through the property. |
|||||||||||||||||||||||||||||||||||||||||||||
Regional Significance | The property lies in the southern part of the Onaman Toshota greenstone belt which formed part of the previously producing Beardmore-Geraldton gold belt. Past production in the belt exceeded 4 million ounces of gold. The Brookbank deposit, which is located 10 km south of Miner Lake is reported to contain over 600,000 ounces of gold. The Hercules deposit located approximately 10 km east of Miner Lake hosts a NI 43-101 compliant Indicated resource of 231,000 tonnes averaging 14.95 g/t Au and an Inferred resource of 761,000 tonnes averaging 4.13 g/t Au. In Geraldton, approximately 50 km east of Miner Lake, the Hardrock Mine Project is proceeding to the construction phase. Production of 4.2 million ounces of gold is anticipated from an open pit averaging 1.02 g/t Au over the next 15 years. Additional underground resources include 1.7 million ounces averaging 3.9 g/t Au. (Source: Premier Gold Mines Website) |
|||||||||||||||||||||||||||||||||||||||||||||
Project Summary |
|
Potentially large-tonnage drill-ready target with several breccia zones ready to be tested by diamond drilling. In addition, petrographic and geochemical alteration studies are recommended to confirm if the postulated porphyry target model applies. Induced Polarization and Resistivity geophysical surveys are recommended to find areas of higher sulphide concentrations and correlate the geophysical results with the drill and alteration studies to determine if increased sulphide content results in increased gold values.
November, 2018
A diamond drilling program comprising 1,010m in five holes was completed to further test the main East-West mineralized corridor as well as other targets on the property. Chlorite altered gold-bearing breccia zones associated with feldspar porphyritic diorite were intersected in each of the 2018 holes, with gold values ranging from under 0.002 g/t to 4.48 g/t/ Au in individual samples. The persistent and widespread distribution of gold in the numerous breccia zones in feldspar porphyritic diorite has confirmed the presence of a large gold mineralizing system on the property. Gold mineralization continues to be intersected and further drilling is required.